Page 10 - ZSi-Foster Beta Hydraulic Clamps
P. 10
Beta Clamp Installation
INSTALLATION ON WELD PLATES INSTALLATION ON MOUNTING RAILS INSTALLATION ON CHANNEL
ZSi-Foster weld plates are available for the ZSi-Foster mounting rails can be used with the The ZSA Nuts can be used with any clamp
1
following Series: following Series: using a ⁄4-20 mounting bolt. This includes:
• Standard Series • Standard Series • Standard Series
• Heavy Series • Heavy Series (Group H3 to H6) • Twin Series (T1 Only)
• Twin Series • Twin Series • Beta Rubber Inserts
• Beta Adapters • Beta Adapters
For best alignment of ZSi-Foster clamps we ZSi-Foster mounting rails are available in two
recommend that you mark their location before different height sizes and are either welded or
welding. bolted to the supporting construction.
(1) Insert Strut Nuts
For Standard Series and Twin Series insert hexa- Into Strut Channel
gon rail nut and turn to lock. For Heavy Series And Turn to Lock
slide in rail nut.
(1) Weld Plate to
Supporting Steel
(1) Insert Appropriate
Rail Nut and Turn to Lock (2) Push Bottom Half
of Clamp Onto Strut Nuts
(2) Push Bottom Half
of Clamp Onto Plate
(2) Push Bottom Half
of Clamp Onto Plate
(3) Install Pipe
(3) Install Pipe
(3) Install Pipe
(4) Add Top Cushion
(4) Add Top Cushion
(4) Add Top Cushion
(5) Add Top Plate and (5) Add Top Plate
Bolt Into Position
and Bolt Into Position
Installation On Weld Plates (5) Add Top Plate
and Bolt Into Position
• Weld metal welding plates to a weight
adjusted base.
• Clip lower half of clamp on to welding
plate and insert tube; then add second
clamp-half, cover plate, and tighten with
screws provided. NOTE: The rail nut will slide within the rail so NOTE: The ZSA Nut will slide within the
• DO NOT weld with plastic clamp in position. clamp units can be adjusted before being firmly Channel so clamp units can be adjusted
• After assembly the two clamp halves MUST bolted. before being firmly bolted.
NOT come into contact with each other.
– 10 – www.zsi-foster.com